  PROJECTS - INFRASTRUCTURE : TRANSPORTATION  
     
 


Bangalore Mass Rapid Transit Limited feasibility study and request for proposals from international bidders. Horizontal and vertical alignment drawings, station planning, preliminary civil engineering design of foundation, columns, box girders etc., cost estimates for 93 km system, selection of route, stations and depot sites.

   
 


Mysore Power Generation Company Limited: Preliminary location survey, alignment drawings horizontal and vertical alignment, cost estimates of about 31 km railway siding with three stations designed to main line standards.

   
 


Pune Mass Rapid Transit Limited. Feasibility study for 72 km MRTS.

   
 


Ahmedabad Mass Rapid Transit System.

   
 


Mysore Infrastructure corridor: Mysore- Bangalore Expressway.

 
     
 


Chamalapura Railway Siding: To carry 3 million tones of coal p.a. from Mysore to Chamalapura Power Plant.

 
     
 


Thapar Water Base at Varakavipuddi, Nellore: Design of 60M Long vehicular bridge across Buckingham canal

 
     
 


Dry port for the Royal Government of Bhutan as a United Nations consultant: Preparing feasibility study and detailed project reports, preliminary planning, design of pavements, buildings, land developments and tender documents etc.

 
     